New tiles floor to ceiling as part of bigger refurbishment which included flooring, Kitchen fitting and decorating.
This bathroom fit involved removing the old suite and tiles, co-ordination of 1st fix plumbing and the partial re plaster before laying new ceramic floor tiles, white metro tiles to walls and fitting the bathroom suite including thermostatic mixer shower, cubicle and tray. Fitting new roll top bath, vanity unit, toilet and towel radiator. We have also formed a new cupboard to house the relocated boiler.
Here we have completed a minor refurbishment of a small bathroom at a flat in morecambe. We have removed the original bathroom, shower, toilet and sink. We have then fitted new plastic cladding to all of the walls including the shower cubicle in a white gloss with a holographic sparkle finish. We have then fitted a new shower tray, shower enclosure with sliding door, new toilet and new sink and taps. All it needs now is a new vinyl floor laying and its all finished.
The plastic cladding is a really effective way to freshen up your bathroom, utility room, W/C. It is much more cost effective than tiling and can be applied over the top of existing tiles. It is a very effective way to improve the appearance of walls and ceilings in trouble spots such as small shower rooms, it provides an easily cleanable surface, very hygenic.